10 May Queen’s Wharf Early Works
Cogent Scaffolding have recently begun the early works on the Queen’s Wharf project with Probuild. We have been contracted to supply and install Powershore, a high load capacity shoring system.
We will be installing Powershore to 3 levels of existing basements so that the piling rigs can track over the top of the slab and begin piling. The slab will eventually be demolished and the basements removed so that the dig can begin for the main structure.
We will also be supplying and installing handrails, and various access and egress to numerous locations on the site.
No Comments