Oceans by Meriton

Oceans by Meriton

Our Oceans by Meriton project is not for the faint-hearted!

We are now at level 75 of the 76 level tower and are ready to Cantilever our scaffold out so that the “crown” can be installed.

This pic above was taken by our Leading Hand who is standing on a Preston Loading-bay looking down from level 75, amazing!

The pic below shows the golden “crown” to be installed on Level 76.

The “Crown” on top of the 76 level, Oceans by Meriton
No Comments

Sorry, the comment form is closed at this time.