06 Aug Queen’s Wharf – 6th August 2021
The image above is the George st zone 4 perimeter scaffold. At the very top there the curved scaffold is the start of the typical building L07-07mez.
The image below is the north podium perimeter scaffold beginning to come down from L06.
Sorry, the comment form is closed at this time.